Gallery Tunnels — 20 km
577
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-577,wp-theme-bridge,bridge-core-3.3.4.8,qi-blocks-1.4.9,qodef-gutenberg--no-touch,qodef-qi--no-touch,qi-addons-for-elementor-1.10,qode-optimizer-1.2.2,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-smooth-scroll-enabled,qode-theme-ver-30.8.8.8,qode-theme-bridge,qode_header_in_grid,qode-portfolio-single-template-8,wpb-js-composer js-comp-ver-8.7.3,vc_responsive,elementor-default,elementor-kit-8
 

Gallery Tunnels — 20 km

Gallery Tunnels — 20 km

Gallery tunnel projects are underground infrastructure works designed to carry utility lines, technical systems and service corridors in a safe, accessible and sustainable manner.

Within the project scope, tunnel excavation works, reinforced concrete structural systems, technical gallery sections, utility corridor arrangements, field organization, engineering coordination, quality control and work schedule management processes are handled with an integrated approach.

XVAV Yapı provides reliable execution capability in gallery tunnel projects with its technical discipline, strong site organization and planned infrastructure delivery approach.

Date
Category
Infrastructure Investment, Metro Tunnel, Utility Infrastructure